The diagram illustrates how the recycling process of aluminium drinks canes.
Overall, there are 11 main stages in the process in the producing the new canes, beginning with waste canes and metals, and end with man produced new canes. Moreover, however, the manufacturing process is continue in six weeks.
To begin with, a number of specific groups who are collect waste canes and metals in our society’s and sell in the local manufacturing companies. Then, the waste materialstransport in the factories using trucks. After that, the metals are deposit by a specific process. Next, washed this canes by water. Following this, the bottles and canes are crushed by pressure machine. Then, the produced items goes to a another process, and again washed this items by chemicals.
In addition, in the next process, the materials goes to another chamber, where the materials heated by fire. Next, the produced items go into a new process, which calledMould and it is an cane degined process, such as, how looked the cane, size and shape. After that, the canes goes to weighting machine for calculated the canes fixed weight. subsequently, the canes transport into another process, where the canes covered by specific company sign and logo. Finally the canes fully prepared and ready to distributed in the whole drinks companies.
