The diagram illustrates how the recycling process of aluminium drinking canes.
Overall, there are 11 main stages in the process in the producing the new canes, beginning with waste canes and metals, and end with man produced new canes. Moreover, however, the manufacturing process is continue in six weeks. To begin with, a number of specific groups who are collect waste canes and metals in our society so, and sell in the local manufacturing companies. Then, the waste materials
transport in the factories using trucks. After that the the metals are deposit by a specific process. Next, washed this canes by water. Following this, the bottles and canes are crush by pressure machine. Then, the produced items goes to a another process, and again washed this needs items by chemicals.
In addition, in the next process, the materials goes to another chamber, where the materials heated by fire. Next, the produced items go into a new process, which called
Mould and it is an cane degined process such as how took the cane and size and shape. After this the canes goes to weighting machine for calculated the canes fixed weight. In the subsequently, the canes transport into another process, where the the canes covered by specific company sign. Finally the canes fully prepared and ready to distributed in the whole in the drinks companies.
