The maps illustrate the school’s plan for changes to the school site over a 20 year period between 2004 and 2024. Overall, it is clear that the school site will see considerable changes in construction of new facilities, buildings, and roads, while the number of students will also rise significantly.
In 2004, there was only one car park to the west of the site where the main entrance to the school was located. There were also two school buildings, accommodating 600 students altogether, separated by a path which connected the western part of the site to a large sports field in the east. Moreover, the school was surrounded by woodland in the north, south, and east.
There are plans to increase the number of students served by the school by 400 in 2024. As a result, a new school building will replace the old sports field, and the two initial buildings are going to be joined together. The old path will connect the original two schools to the new third school, no longer connecting to the west part of the school. Furthermore, a part of the woodland in the east is planned to be deforested and replaced by a new car park, as well as a new, smaller sports field. Finally, a new road will be extended passing south of the school building, which will connect the two car parks.
