The maps illustrate changes between now and planned future development that will take place in the town of Norbiton.
From an overview, the future development plan for Norbiton’s industrial area indicates significant advancements and modernization, introducing new amenities and infrastructure..
The future map depicts an extension of the main road leading to various attractions. First of all, a smaller roundabout will be constructed in the south of the existing large roundabout. Furthermore, the main roundabout is also going to have two branches, one of which will be broadened to residential living area while the other will pass the river, taking spaces from the farmland. Notably, the longest road of the large circle will also be upgraded which ends with school and it’s only branch is going to start from a playground.
According to the implementation plan, there will also be several changes that surround the roundabout. To be more precise, Eight factories will be decided to be pulled down, to make way for the construction of seven houses, located in the east, northwest, and along the riverbank. Additionally, additional facilities for instant shops and a medical center will be built in the southwest and southeast of the roundabout, respectively.
