The maps illustrate the current layout of a post building and the future modifications that are planned to be made.
Overall, as the building will be enlarged in the future a meeting area and an outdoor seating area are planned to be constructed. While storeroom will remain the same, kitchen and canteen will be fully removed. Additionally, the location of one of the entrances and WCs will change. Finally, although the number of offices will be similar, they will be extended.
In the future map, meeting area and outdoor seating area will replace the grass which is located at east and west part of the building, respectively. Moreover, chairs and the coffee machine will be placed in these areas. While the WCs are right in front of the entrance, they will be at the top right corner in future. Furthermore, the entrance on the botttom part of the map will move to the west, centering two offices.
Compared to the current illustration, kitchen and canteen will be demolished and two new offices will be built. In addition, four offices on the bottom part of the map will be engaged, changing to two seprate areas. Conversaly, the storeroom will not face any modification.
