🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: The maps show an island before and after the development of a tourist resort.

Image for topic: The maps show an island before and after the development of a tourist resort.
Our system will evaluate the answer based on this AI-generated description.
The image depicts a comparison between two maps of an island from 1990 and the current period. In 1990, the island features 11 palm trees, 2 beaches, and no apparent structures or paths. In the current map, the island includes a restaurant, reception, 15 hotel housings concentrated in the middle area, and separate accommodation comprising 9 individual units occupying the western side. There is a pier with boats shown docking, a swimming pool near the central housing area, vehicle roads linking the reception to the restaurant, and pathways connecting all accommodations to the main infrastructure. Additionally, the eastern beach is noted as a designated “Swimming” area.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The maps illustrate the layout of an island in 1990 and the present day.

Overall, the island has undergone an extensive development, with several recreational facilities being constructed, as well as transportation access. Both the trees and the beach have been retained throughout the years.

In 1990, the island was completely uninhabited with no tourist amenities available. The island consisted of only trees which were scattered throughout the island, and the beach located in the western side.

At present, the island has been developed significantly as a tourist resort. A reception building has been constructed on the central region, and a restaurant occupies to the north of this building. Additionally, two complex of huts have been added on the western and the eastern regions of the island. A swimming pool and a cafe have also been built between the reception and the eastern accommodation. Further construction has also taken place in the southern coastline, with a pier being added to accommodate the boats. The beach in the west has remained unchanged, and now been functioned as a swimming area. Moreover, all of these facilities are connected by the footpaths. The green areas have been preserved over the period.

Word Count: 198

Answers On The Same Topic:

The maps show an island before and after the development of a tourist resort.

The maps illustrate an island at its present and prior to the construction of a tourist resort in 1990. Overall, the development of the tourist resort has significantly altered the look of the island: numerous detached houses, eating places, swimming places as well as a pier have been established. In 1990, the island was completely […]

See All

Other Topics:

The map below shows three proposed sites for a new hypermarket (A, B and C) in the city of Pellington.Summarise the information by selecting and reporting the main features and making comparisons where relevant. Write at least 150 words.

The map shows three different areas that will have a new hypermarket in the future. Starting with area A, it is the residential area, where must be the highest population in the map. Here the hypermarket will have a good profits because of the population and it will work and growth faster than the other. […]

The map depicts the changes in the science park between 2008 and today.

The given maps illustrate how a science park has changed from 2008 to the present day. Overall, the park has undergone significant modernization, with the addition of new facilities, improved transport infrastructure, and the replacement of some older features. In 2008, the northern side of the park was largely covered by grassland, while the offices […]

The map below shows the plan of a proposed new town. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The picture depicts the proposed layout of a new town. Overall, the area will be dominated by residences and industrial sites, accompanied by a complex infrastructure. Looking at the outside of the ring first, this area will comprise a total of nine residential buildings, with six of them and a recreational zone being located in […]

The two maps bello show road access to a city hospital in 2007 and 2010. Summarize the information by selecting and reporting the main features and make comparisons wherever revelant.

The two maps show the changes in road access to a city hospital between 2007 and 2010. Overall, the hospital area became more developed with better public transport and parking facilities. In 2007, the hospital was surrounded by a ring road. Hospital Road connected the City Road in the south to the ring road. There […]

The maps below show the changes that have taken place in the town of Liverton between 1980 and now.

This map illustrates a comparison of changes that have been made in Liverton town between 1980 and now. Overall map, has changed alot since 1980 as seen some building are replaced and some are newly built. There is also a system to avoid flooding and a museum is river. A path for river walk has […]

The maps below shows the layout of a public park in 2010 and the same park now

the maps indicate the layout of a public galary in 2010 and the same park in recent days. overall it is clear that, there has been a massive changes in the park in recent times compare to 2010. To start with, in the southeast part of park which was occupied by a stage in 2010 […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.