The given maps illustrate changes in the layout of the conference centre which is manufacturing for better facilities between 2010 and 2025.
Overall, a brief analysis reveals that several large changes will be made to the conference centre throughout the years, including the addition of new facilities like Residence Hall, IT center, Canteen, two meeting room,game room and music room. and relocate some infrastructure such as garden and car park.
Looking at the maps in more detail, in 2010, the center had a simple design with seven areas, including two gardens, a reception, a car park, a hall, and two rooms. The rooms, located in the top left-hand corner of the center, were immediately adjacent to the hall and the reception. The reception was directly connected to one of the gardens, while the other garden was on the eastern side of the center, next to the car park.
In 2026, the rooms in the northwestern corner will undergo no changes, but the hall and the reception will be enlarged due to the relocation of the car park and the demolition of the eastern garden. The garden, which was located on the left-hand side of the center, will be relocated to the eastern part in 2026. As a result, a new residence hall with a capacity of 20 rooms will be built. The car park will be moved to the southeast, while the reception and garden areas will be expanded. A variety of new facilities will be added, including an IT center, a game room, a music room, meeting rooms, and a canteen.
