The plans compare between the layout of a harbour in 2000 and now.
Overall, while the size of the harbour remained nearly the same, many facilities
have been added.
Looking into details, more docks have been added to the same area of the old dock keeping the passenger lernes in the same position. Fishing boats and Marina (private yachts) have been switched in places. Additional showers and toilets have been built to the north of the southern car park. Also, showers and toilets and car park, which were located in the north, have not been changed.
One siginificant change was that the disused castle in the south has been renovated into an hotel. Moreover, the road has been extended to reach directly the hotel. The beach, beside it, has been changed into a private one for the hotel. However, the northern public peach has stayed the same. New cafe and shops are now open just beside the lifeboat.
