24 Hours Only: Get 39% OFF on Our Premium Plan - Check Out Now!
Map

Band 5+: Task 1: The two maps below show road access to a city hospital in 2007 and 2010. Summarize the information by selecting and reporting the main features and make comparisons wherever relevant. Write at least 150 words.

Image for topic: Task 1: The two maps below show road access to a city hospital in 2007 and 2010. Summarize the information by selecting and reporting the main features and make comparisons wherever relevant. Write at least 150 words.
Our system will evaluate the answer based on this AI-generated description.
The image depicts two maps of City Hospital from 2007 and 2010, showing infrastructure changes. In 2007, the hospital is surrounded by the Ring Road, with Hospital Road running south from the hospital intersecting City Road. There are three bus stops along Hospital Road to the east and south. The car park for staff and public is to the southeast of the hospital and connects to City Road. By 2010, a roundabout has been introduced at the hospital's southern entrance where Hospital Road meets City Road. A new road extends east from the roundabout, leading to a dedicated public car park located northeast of the hospital. The original hospital car park has been redesignated for staff only. A bus station has replaced the former bus stops and is positioned southwest of the hospital, connected via another roundabout on Hospital Road. The map includes a compass in the top-right corner indicating north, with a bus stop and roundabout symbol marked in the legend.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

Those maps illustrate changes at road access to a city hospital comparing 2007 and 2010.

Overall, the town underwent significant development, with more residential areas and new roads appearing over the period. New buildings and areas for car parking were established. Road has been extended in order to connect city hospital and bus station.

In 2007 , the hospital was surrounded by Ring road ,which connected to Hospital road lead to City road. Car park was located right in front of the city hospital for staff and public. Along the road were several bus stations for patients and staff.

Comparing to 2007, in 2010 changes were notable. Public car parking has been established to the right side of the building but the place for staffs cars remain unchanged. Roads were extended and bus station has been connected to Hospital road. Two roundabout roads were built connecting Ring road and City road together.

Word Count: 152

Answers On The Same Topic:

Task 1: The two maps below show road access to a city hospital in 2007 and 2010. Summarize the information by selecting and reporting the main features and make comparisons wherever relevant. Write at least 150 words.

The maps illustrate the previous layout of road access to a local hospital and how it appeared following renovation in 2010. In 2007, the City Road was situated on the south side. Just before reaching the hospital, there was a narrow hospital road with six bus stops, three on each side. To the east of […]

Task 1: The two maps below show road access to a city hospital in 2007 and 2010. Summarize the information by selecting and reporting the main features and make comparisons wherever relevant. Write at least 150 words.

The two maps illustrate changes that have taken place at the city hospital over a 3-year period between 2007 and 2010. Overall, the city hospital has undergone remarkable modifications to its road infrastructure and several surrounding areas. According to the first map, in 2007 there were bus stops along the hospital road (road towards city […]

Task 1: The two maps below show road access to a city hospital in 2007 and 2010. Summarize the information by selecting and reporting the main features and make comparisons wherever relevant. Write at least 150 words.

The provided maps present the development of the road access to a city hospital between 2007 and 2010. Overall, it is clear to see that there were major improvements in the road, involving a new bus station, new roundabouts and new car parks. Additionally, the modification aimed at managing the traffic better. One of the […]

Task 1: The two maps below show road access to a city hospital in 2007 and 2010. Summarize the information by selecting and reporting the main features and make comparisons wherever relevant. Write at least 150 words.

The two maps shown below are the comparison of road access to the city hospital in 2007 and 2010. By looking at these two layout, we can observed that the road which was made in 2007 was much simple but the 2010 one is much better in terms of managing the traffic. In 2007, the […]

See All

Other Topics:

TOURISM The two maps below show an Island, before and after the construction of some tourist facilities. Summarize the information by selecting and reporting the main features, and make comparisons where relevant

Both maps display an island, before and after it was developed for tourism. The island is long and thin, is surrounded by ocean and has a beach to the west. Over the period, the island was completely transformed with the addition of a hotel and a pier; however, the eastern part of the island appears […]

The maps below show part of a village in 1910, and the same part of that village in 2010. Summarise the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The image presents the overview map of Shalton village in 1910 and 2010. A remarkable change made between 1910 to 2010 is that the number of houses has increased, especially besides the Lodon Road and High Street. Furthermore, some of local facilities have changed to another. For example, a butcher became a supermaket with a […]

The map shows a popular tourist destination in a city in 2000 and 2010. Summarize the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The map depicts changes in popular tourist site in a city from 2000 to 2010. Briefly, the area was upgraded by adding some new facilities. However, its overall view remained unchanged. First of all, starting from the north of the zone, the guardrail was erected on the river bank, which runs along the entire destination. […]

The map shows a popular tourist destination in a city in 2000 and 2010. Summarize the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The map shows a famous tourist site in a city in 2000 and 2010 . Overall , it can be seen that there are many changes to attract tourists . In 2000 , there was a gift shop and a toilet behind it . And hirltage railway beside the river . In 2010 , there […]

The maps show changes in a city in 1950 and now.Describe the changes and make a comparison where relevant.

The diagrams illustrate the transformations of a city from 1950 to the present. Overall, the city has undergone significant modifications, expanding nearly all areas to accommodate its rapidly growing population. Additionally, it is evident that the city has added major roads, enhancing accessibility. In 1950, the entire population of 20,000 residents lived in the residential […]

The maps below show a coal mining site before and after redevelopment. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The maps illustrate how a coal mine has been redeveloped into a tourist attraction. Overall, the industrial mining area has experienced major changes in its layout, with the elimination of the Waste tips and the addition of recreational facilities. Looking at the initial layout of the coal extraction site, featuring a relatively simple layout, with […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible and free for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
1000+ IELTS Tests & Samples
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & Content
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
279,000₫ 157,000 ₫ cho gói 1 tháng (chỉ 5,233₫/ngày)
819,000₫ 397,000 ₫ cho gói 3 tháng (chỉ 4,411₫/ngày)
1,649,000₫ 667,000 ₫ cho gói 6 tháng (chỉ 3,706₫/ngày)
3,299,000₫ 857,000 ₫ cho gói 12 tháng (chỉ 2,381₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.