🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: The charts show how an office looks like at present and its future development plan.

Image for topic: The charts show how an office looks like at present and its future development plan.
Our system will evaluate the answer based on this AI-generated description.
The image displays two diagrams: "Office at present" and "Future development of an office". The present layout features a central entrance leading to a reception area. To the left and right of the main building are two grass areas. The interior consists of four offices along one side, and a kitchen, canteen, and stock room along the other. A WCs area is located next to the stock room. The future development layout shows the left grass area replaced by an outdoor seating area with two sets of tables and chairs. The right grass area is replaced by a long room containing a meeting area with sofas and a table, a coffee area, and the WCs. The interior layout is changed to four offices, a stock room, and a central reception area with an entrance, while the kitchen and canteen are removed.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The two maps show the current office and how it is going to transform to a new working area for future advancement.

Overall, entrance will be moved to the bottom center of the building and kitchen areas will be demolished for giving more space for the office rooms. A couple of facilities will be constructed by removing the grass.

At present, the construction has four working spaces, lining next to the left hand side of the entrance. To the opposite of these offices, the map includes kitchen, canteen and a stock room. By walking down the entrance, workers can find the reception as well as the toilet if needed. For both left and right sides of the office center, grass is occupying the large spaces.

To reconstruct the area, the entrance and the reception will be moved to the bottom center area, dividing the two big offices. The kitchen and the canteen will be wrecked with the aim of giving spaces for the other two working rooms, whereas the stock room stay in the same position. But the WCs will be rebuilt next to the coffee area at the outside of the office on the right by removing the grass, and at the bottom of this site, spacious meeting area is planned to be erected. By stripping the grass on the left, three outdoor seating sites are about to set up.

Word Count: 231

Answers On The Same Topic:

The charts show how an office looks like at present and its future development plan.

The plans display the current organization of a typical office, with projections for the future development of it. Overall, significant changes are planning to make to the interior of the office with the addition of several new facilities. Notably, a few features from the original layout will be remained intact, while the remainder are likely […]

The charts show how an office looks like at present and its future development plan.

The maps represent the major changes that are expected to take place in an office between the present and future. Overall, it is evident that the area will undergo a substantial development, especially due to the change of infrastructure. To begin with, two of the four offices which are located along the same wall as […]

The charts show how an office looks like at present and its future development plan.

The maps shows the look of an office now and how it is expected to look like in the future. Overall, in the future, there will be less facilities, like kitchen. However, there also will be more of outdoor facilities, such as but more of the Currently, a reception desk is opposite the entrance, which […]

The charts show how an office looks like at present and its future development plan.

The two maps illustrate the major changes that are expected to take place in an office between the present and future. Overall, it is clear that the area will undergo a significant development, primarily due to the change of infrastructure. The most noticeable change will be the removal of grass areas, and the area will […]

See All

Other Topics:

The maps illustrate how a museum and its surroundings changed in 1990 and 2010

The map above clearly shows the difference of the museum and its surrounding area between the years of 1990 and 2010. During 1990 the guests would enter through the main road to find a wide garden that stretches from the right side of the road to the carpark. Then they would leave the cottage to […]

Th emaps show the changes of Frenton town over the 22 years.

The plans show the changes that took place in Frenton in the oeriod between 1990 and 2012. Overall, the modification that happened in the urben area mostly were: an expension procuders to sertain buildings to insure their efficiency, or conversion processes to some buildings’ activity. The old map shows that a main road callede high […]

The diagram below shows the changes, which took place in a coastal area called Pentland from 1950 to 2007. Write a report for a university lecturer describing the diagrams below.

The maps illustrate how a coastal area, namely Pentland, developed from 1950 to 2007. Overall, Pentland urbanized to be a residential area, with the addition of communal amenities. It is also worth noting that the coastal town developed more roads with the reduction of grassland and industrial area. In the northwest of Pentland, the area […]

The two maps show an island before and after the constructions of some tourist facilities

The diagrams illustrate island’s look before and after adjustments for tourists. Overall, there was nothing on the island, but a beach as well as trees. After the improvements, a lot of tourist facilities were added. Notably, pier also was added so as to access to the land. In the center of the southern part by […]

The two maps show an island before and after the constructions of some tourist facilities

The diagrams illustrate island’s look before and after adjustments for tourists. Overall, there were nothing on the island, but beach as well as trees. After the improvements, a lot of touristic facilities was added. Notably, pier also was added so as to access to the land. In the center of the southern part by the […]

The maps below illustrates how Frenton changed from 1990 to 2012

The two maps illustrate the changes that took place in Freton between the year 1990 and 2012. Overall, while the school, library and hospital remained unchanged, all the remaining infrastructure underwent significant changes. Additionally, these changes show that the town became more modern in order to meet the needs of society. From 1990 to 2012, […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.