The two maps depict the current layout of the industrial area in Norbiton and the proposed development plan for the site.
Currently, Norbiton comprises several factories situated near the central roundabout. A Town is located to the West and Farmland is above the River to the North. Consequently, the architectural sketch includes the construction of a new bridge over the River that connects Farmland with the central part of the manufacturing area. Transportation system is planned to be more expanded with a mini-roundabout on the South side and additional road branches that facilitate accessibility.
Furthermore, the future project envisions the replacement of existing enterprises by creating an advanced residential area. Plans for the development of social infrastructure include building amenities such as shopping spots to the West, a medical centre, a school and a playground by the East side. Despite these changes, the Town appears to remain without any major transformations, suggesting a preservation of its current structure.
Overall, the planned development is aimed at shifting the Norbiton industrial zone into a more multifaceted and enhanced neighbourhood.
