The diagram illustrates the changes that will occur in the University Sports Centre in the future. In general, the sports center has undergone significant changes, including the demolition of two outdoor courts to make way for a leisure pool and a sports hall.
In detail, the central area of the building is a 25m pool while above it is a gym. On the right side of the building, there is a seating area, and on the left is a changing room. The reception desk is located in front of the entrance, where everyone is welcome. Outside, there are two outdoor courts, one on the left and the other on the right side of the building.
In the future plans, the outdoor court will be demolished to extend the indoor area to both sides, providing more facilities to meet the diverse needs of people. The outdoor courts on the left will be knocked down to make room for a variety of facilities, including a small sports shop in the reception area, which will display sports equipment. On the left-hand side of the building, a new changing room and a large leisure pool will be introduced. The outdoor courts on the right-hand side will be replaced by a sports hall. The gym will be extended to accommodate more diverse facilities. In the top right-hand corner of the map, two dance studios will be built, with the establishment of a third changing room and a small cafe directly opposite the sports shop in the reception area.
