🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 4+: Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

Image for topic: Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image shows two maps depicting Norbiton industrial area currently and its planned future development; the current map features a central roundabout with junctions leading to a factory southeast, additionally spread-out factories are throughout, with farmland northeast, two branching roads, and empty land near the central roundabout; the future development map shows central roundabout additions including exits north to school, east to playground, and west to housing; the existing factory south converts to a medical center; additional junctions and roundabouts extend to housing to the south and east, shops northwest, school north, playground east, medical center south, and farmland transforming into housing in the northeast.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

In these images, we can see the way of removing all industrial buildings to build new apartments.

Moreover, as time changes, population af area will increase. They will have a demand for public areas and services. Such as school, playground, shops and medical cnetre.

In addition, the circular road that connected factories will remain, but, path will be extended to the north to meet the bridge for getting access to the latest housing areas. The farmland will remain to the east of blocks of flats.

Furthermore, one of the southest side of the Norbiten, will be built a new round-a-bout for providing residents to don’t face with traffic congestions. And also there will be some recently constructed paths for new housing areas to the northern-west of old round-a-bout.

Word Count: 128

Answers On The Same Topic:

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The map above illustrates an industrial area in the town of Norbiton from the present to the future plan of refurbishment that will happen. Overall, the map indicates that the future development will expand the roads and the amenities around town. From the map of the present, it shows the road by the lake is […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The two maps illustrate the industrial region of Norbiton town, as it is now and the development plans for the future. Overall, it can be observed that industrial site will be replaced with housing area and redevelopment of some amenities, such as shops, a medical centre, a playground, and a school for public convenience. Currently, […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The figures illustrate a Norbition undustrial site now and its forthcoming changes. Overall, the area is planned to have factories replaced with housings. Moreover, it may be expected to turn into a place full of new facilities for people. Now, the industrial area has two main roads connected in the center of the town. There […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The two maps depict the town of Norbiton industrial area at present, and proposed future plan for improvement. Overall, industrial buildings will be expected to change houses. It can be seen from the maps, several facilities will be offered to build like recreational area, educational center and the infrastructure of the city will be developed. […]

Symmarize the information by selecting and reporting the main features, and make comparisions where relevant.

The New Design of the industrial area for the future is planned in the town of Norbiton in the given maps. The expansion of the region depicts that industrial sector will be replaced by residential area, moreover some facilities including school, playground, hospital are also added for convenience. Firstly, industrial units are substituted with local […]

See All

Other Topics:

The plans below show the layout of the fround floor of a museum in 1990 and in 2010

The plans illustrates the layot of museum ground floor in 1990 and 2010. Overall, the layout show seven main changes concerning. The first map which was made in 1990 had only gift shop while, the second map made in 2010 had gift shop and cafe. Between gift shop and natural history room in 1990 hadn’t […]

The plans below show findings at an archaeological site in 1890 and 1990.

The plans illustrate findings at an archaeological site in the period from 1890 and 1900. As an overall trend, the green areas were dramatically decreased. Furthermore, there were significant changes in main features over the period given. In 1890, the green area were almost third the total area of the site. While, archaeological site had […]

the plans below show a small theatre in 2010,and the same theatre in 2012

The diagrams illustrate how the layout of a small theatre was redeveloped between 2010 and 2012. Overall, the theatre underwent considerable changes, with several existing facilities being relocated, replaced or converted into new ones. However, the main entrance and the auditorium remained largely in their original positions. In 2010, visitors entered the building through the […]

The two maps illustrate developments in the Lakeside area between the years 2000 and 2009

Two maps depict the evolution of the Lakeside area over a nine-year period, from 2000 to 2009. Overall, the Lakeside area underwent substantial development, with several existing areas being removed and expanded, and a number of new facilities being added. Also, it was notable that the lake was reduced in size and eventually becoming a […]

The maps below show an island in 2005 and 2020. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps illustrate the differences of an island in two different years -2005 and 2020. Overally, many developments took place as the years cross by from 2005 to 2020. Many infrastructures have constructed in the island in 2020. From the chart, it can be seen clearly that in 2005, the island was entirely occupied by […]

The map below shows the development of a seaside village between 1995 and present.

The plan illustrates how the village of Ryemouth has changed from 1995 to the present time. Overall, this area has experienced significant gentrifications to accommodate more residents partly through providing more entertaining facilities and public spaces. In the land, the farmland, which previously located in the at the right corner of the town, has been […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (2 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress & Analyze Mistakes By Question Type
Save Your Own Flashcard Sets & Use Them On Any Device
Unlock All Courses, IELTS Tests, Section & Part Practice
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools & AI Features
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Buy activation codes in bulk and give one to each learner. A code does not expire until it is used, and each subscription only starts counting once its code is entered, so you can buy now and hand them out later.

10+ codes: 10% off 25+ codes: 15% off 50+ codes: 20% off
The codes are emailed to your payment address as soon as the payment goes through, and are also shown on the confirmation page. A tax invoice is issued automatically at checkout — select Purchasing as a business there to put your organization's name and tax ID on it.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.