The two maps illustrate data about how an office building is planned to be transformed into a dental clinic.
Overall, it is evident that the structure of the building will undergo significant redevelopment with noticeable alterations in position of rooms and facilities.
In detail, grass areas are located in the west and east parts of the building. The first grass area, which is situated on the left side, is going to be replaced with a new outdoor activity area in the clinic. At the same time, another one located in the east will be converted into a meeting area and a small room for a coffee machine. These will be in the south-east and north-east sides of the dental clinic.
Turning to other changes, there are four adjoining office rooms just next to the entrance and in close proximity to the reception in the building. Simultaneously, the building consists of a kitchen and a Stock room in the north part, while a canteen is located in their middle. It is expected the kitchen and the Stock room will be removed, and two of these office rooms are going to be relocated to their places. Moreover, the position of the reception area is planned to be relocated to the middle of the office rooms in the south. 216 words
