The pictures describe the current layout of an office building and the proposed changes after reupgradation.
Overall, the design undergoes a number of dramatic changes, the most important of which are the development of large offices and more rest places such as chairs, meeting area.
In the western wing, there used to be a grass; however, it is then replaced by outdoor seating area in the north-west of building and some chairs in the south-west corner. In the right side next to new outdoor seating section, the kitchen and canteen converted are converted into two workrooms, while the storage area is remained. Additionally, the WC is redeveloped as smaller, moving to the north-east corner of the building.
The east of building witnesses significant changes, with the replacement coffee machine by the the green space by coffee machine and the construction of meeting area and some chairs. Moreover, the offices in the southern section are developed rebuilt as near bigger.
