The maps compare the current layout of the college with its planned development. Looking from an overall perspective, it is going to become significantly convenient and there will be built new facilities for students. The general changes will be related to science department and sports area, while the current alley with trees will be subtracted.
At present, administration office is located on the left top side with car parking beside it. Moving below, there are sports fields and some empty area. In the center, the main building contains ten teaching areas, which are devided by long corridor with a staff room at the end. Finally, trees are occupied the right side of the plan.
On the future layout is only administrative office will left on present location.
The parking slot is going to replaced to building with cafe and library. Sports fields will reduced in size and there is a new sports hall aside. On the main site will additional teaching classes for each side and increased staff room. Instead of the alley there is extended construction with an extra entrance where are will be three laboratories and a computer room.
