The diagram compares how a school will be renovated in 2025 with its present layout.
Overall, the type of most constructions remain unchanged, while some buildings are going to relocate and the quantities of some sports areas are going to be added up.
The main school buildilng at the center of the school will stay at its current location, so as the playground on the south of it. However, part of the playground will be occupied by the new built basketball and tennis courts, with the number of the basketball courts increasing from two to four. Meanwhile, the canteen will be moved to the shool’s east area next to the school building, so that its present place can be used to build a new science building for the students.
The peripheral buildings like the sports building and the football court will still be in the southwest of the school, where a new entrance will be constructed beside them. Alongside the entrance there will be a small parking lot with 10 spaces for people to park their cars. The entrance in the northeast of the school are going to retain, however a new roundabout will be constructed, connecting parking lot in the north and the staff parking lots at its south with 150 and 30 spaces perspectively. The housing across from the school and most of the green areas remain unchanged too.
