The two maps show the layout of a small theater on 2010 and the same theater after renovation in 2012.
Overall, the theater underwent several noticeabele changes, mainly involving the addition of new facilities and the rearrangement of some existing rooms. The improvements made the theater more modern and functional than the old one.
In 2010, the theater had fairly simple design. The stage was located in the middle, with a dressing room on the behind and storage are on its left side. At the front, there were three small rooms, sampling a cafe on the right and an admin office and ticket office on the left.
Meanwhile in 2012, the layout had been modified significantly. The cafe was replace by larger restaurant, whereas admin office and ticket office switched places. A new corridor was added behind the stage, connecting the dressing room to the newly bult shower that will be very useful for the caster to clean up their body. And the relocated storage room on the right. These additions made the backstage area mpre convient and connected one of each other.
Overall, the 2012 design shows a clear effort to expand the facilities and improve accesibility for both staff, visitors, or the actor.
