The maps illustrate the changes in a theatre from 2010 to 2012. Overall, the theatre underwent significant alteration such as the supplementation of new facilities including corridor and restaurant, resulting in the expansion of the building. Despite changes made, the auditorium and main door remained unchanged.
Upon closer inspection, in 2010 the theatre has a dressing room and a stage on the top with a small storage by its right side. At the bottom, there was an auditorium with a large significant number of seats for audiences. At the left corner of the bottom, the building has a ticket office, which was next to an admin office at the left corner. Finally, the main door was located near a café at the left corner of the layout.
Two years later, the theatre experienced noticeable changes. Particularly, the dressing room was reduced in size and replaced with a new corridor, leading to the expansion of the stage. At the left side, the storage was moved to the right side and its previous position was made way for a dressing room and showers. Addition to this, while the admin office was moved right next to the unchanged auditorium and the ticket office replaced the café at the right corner, there was a new restaurant at the vacant space of the left corner. Ultimately, the main door still remained at its initial position.
