The maps illustrate how a small theatre was changed from 2010 to 2012. Overall, the theatre had undergone drastic changes, with the most notable being the expansion of the front and back areas to accommodate new facilities. However, the sitting area had remained intact throughout the year
In 2010, upon entering the main door, the visitors could spot the ticket and admin offices adjacent to each other in the left corner and a cafe in the opposite side, but later the ticket office had replaced the cafe and there were the movement of the admin office to the left side of sitting area with the construction of restaurant in the left corner in 2012.
Turning to the rear stage, the dressing room in 2010 was transferred to the left side in 2012, where the old storage had been, with the new expansion of showers to enhance convenience for actors. Additionally, the previous dressing room had been changed to a corridor and enlarged to the L shaped area. Regarding the storage, it had been moved to the left side of the corridor and widened in sector. Finally, the stage and the sitting area remained unchanged throughout the years.
