🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 8+: The two maps below show the changes of a small park from 1980 to the present day. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

Image for topic: The two maps below show the changes of a small park from 1980 to the present day. Summarise the information by selecting and reporting the main features and make comparisons where relevant.
Our system will evaluate the answer based on this AI-generated description.
The image depicts two schematic maps of a park from 1980 and the present, both oriented north at the top. In 1980, the park had two ponds at its center, surrounded by four benches arrayed in a square around the upper pond, two benches on the north side, and two benches to the west of the ponds. There were six picnic tables located vertically on the west side and fourteen flower beds laid out into two vertical columns at the southeast. A wall encloses the park on the north, west, and east sides. Twenty trees are located in the north and southwest near the wall. A gate was located north, with a path leading to the south towards the picnic tables. Presently, the park comprises one pond at the upper center, flanked by four benches at three compass points except the south, four picnic tables located vertically in the eastern section alongside three benches in the south, eight trees in the park, three bushes clustered in the bottom pond region, and north entrance providing access into the park.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The two maps compare the layout of a small park in 1980 with its current design.

Overall, the park has been transformed from a predominantly natural and enclosed space into a more open recreational area, with facilities added for social activities such as picnicking and barbecuing.

In 1980, the park was completely surrounded by a wall, with entrances located on each side. At the centre, there was a pond encircled by four benches. The southern section contained two large rectangular flower beds, while the northern and eastern parts were largely occupied by trees.

At present, the boundary wall has been removed, resulting in a more accessible layout, with only two entrances remaining to the north and south. The central pond and surrounding benches remain unchanged, but the flower beds have been replaced by picnic tables on the western side and a barbecue area in the southeast corner. Additionally, while some trees still exist in the north, several have been removed, and bushes have been introduced to the southwest, further altering the natural landscape.

In summary, the park has shifted away from a nature-focused design towards one prioritising leisure and communal activities, with significant changes in both its structure and facilities.

Word Count: 200

Answers On The Same Topic:

The two maps below show the changes of a small park from 1980 to the present day. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The maps demonstrate the differences between the 1980s and the present day. The park has change incredible during the period. The road become bigger and some great places like picnic tables were added. In 1980, there was only one road around the park. On the right side there was a foster and the flowerbed. On […]

The two maps below show the changes of a small park from 1980 to the present day. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The given picture illustrates the way in which the layout of a small park has changed for renovation purposes. Looking at the illustration, it is immediately evident that some old features have been still there, whereas others such as wall and gates have all been gone. Additionally, from 1980 to present day, the place has […]

The two maps below show the changes of a small park from 1980 to the present day. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The pictures given illustrate the way in which a small park has changed for tourism between 1980 and now. Looking at the illustration, it is immediately evident that some old features have still been there, whereas others such as the wall have all gone. Additionally, over the period, the park has undergone dramatic transformations with […]

The two maps below show the changes of a small park from 1980 to the present day. Summarise the information by selecting and reporting the main features and make comparisons where relevant.

The given pictures illustrate the way in which the park has changed for urbanizable purposes between 1980 and the present. Looking at the illustrations, it is clear that some features were still there, whereas others such as the flower garden disappeared completely. Additionally, over the period of time, the park experienced some major changes including […]

See All

Other Topics:

The map below shows the development of an area between 1995 and the present. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The given maps illustrate a number of changes which took place in a village, comparing 1995 with the present. Overall, it is clear that the village has witnessed drastic changes, with the most noticeable being the replacement of farmland and forest park by a golf course and tennis facilities. Additionally, the old fish port and […]

The maps below show the changes that occurred in a town named Malvern in 1820, 1920 and 2020. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The map illustrates the Town of Malvern, and the the development that ensued in it over a period of 200 years, from 1820 till 2020. The bird’s-eye examination of the images highlight notable additions and alterations that occured in this area from 1820 to 1920, and subsequently, from 1920 to 2020. Numerous changes, especially in […]

the maps below show the changes that took place at the seaside resort of Templeton between 2000 and 2013.

The maps show the developments that took place at the seaside resort of Templeton between 1990 and 2005. In 1990, the town was a much greener residential area with a large number of trees and individual houses, but during the next 15 years the town experienced a number of dramatic changes. The most striking feature […]

The maps below show the changes that occurred in a town named Malvern in 1820, 1920 and 2020. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The provided illustration demonstrates the town of Malvern and the development that ensued in it within 200 years. A bird’s-eye examination of the images highlights some notable additions and alterations, especially in the residential and urban landscape, signified by an increased number of houses, the construction of a bridge, the eradication of the farm, the […]

The two maps show Kingston's University Hospital in 1990 and 2020.

The two map figures demonstrate Kingston’s University Hospital with respect to 30-years time period, between 1990 and 2020. Overall, the map illustrates how the hospital and parking area enlarged to eastern territories to accommodate the increasing need for public health services. The forest area, which covered the north-eastern region was removed, and new University Hospital […]

The images illustrate the layout of the town/city called Lakeside from 2000 to 2009/ over a span of 9 years(2000-2009).The images illustrate the layout of the town/city called Lakeside from 2000 to 2009/ over a span of 9 years(2000-2009).

There are two images which illustrates that how an lakeside is beig updated from 2000 to 2009. Overall, it can be seen in the both pictures that in years there has been lots of development which has been done year by year for instance, car parking, art centre, cinema and much more. On the one […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.