The two plans exemplify a sports centre and its facilities at the year of 1995 and the further development it has been undergone until 2015.
Overall, the swimming pool have not undergone any development but one entrance has and from shower room.
In 1995, the reception was the main entrance to the sports hub which has been located at west. Next to it, restaurant and GYM were occupied at south but faces north. Directly opposite to it the swimming pool has been located with attached changing room. Finally, the football pitch was separately outside the sports centre at east.
In 2015, the sports centre has lot of developments and allocated some spaces for new facility. The old reception area has been converted into changing rooms and beside that a disabled changing room and showers which has one connectivity to each of other and another entrance for the disabled changing area. The old changing area has strinked and also transformed to a sauna. The restaurant had been splited into two which contains café and reception. Next to it, the GYM space had enhanced and right next the sports hall which is newly introduced.
