The maps illustrate how school was transformed from 1985 to the present, highlighting the principle changes to its layout, buildings and facilities.
Overall, the school underwent substantial redevelopment during the period, with the original layout being considerably altered through the introduction of new facilities and the removal, replacement, of existing ones. Despite the extensive transformation, the office to the left remained unchanged, while the area as a whole became more accessible.
At the beginning of the period, library was situated in the west side of the plan, with a office positioned to the front. Over the following years, this section underwent significant modification with library has been demolished, making way for learning resources center, computer room and classrooms. Furthermore, the playing fields has been reduced toward the bottom of the layout, while a new pool and fitness centre have been introduced in south-west corner.
Turning to the remaining part of the site, the classrooms have been introduced in the eastern side, while mentioned one looks much more larger compared to the past. Another notable development is the expansion of classroom block. Compared to 1985 it was a 2 storeys building, now with the redevelopment, it expanded into a 3 storeys building. Meanwhile, there was a car park front of the library, which has been removed in the existing plan. Finally, the car park with entrance and exit have experienced a slight change in there shape, whereas these features retained there original position.
