The maps illustrate the information about the South west airport redevelopment plan which show the how many changes are made after development in the next year.
Overall, the airport is Provide less facilities like checkin, Cafe and walkway in Present time. In future, it is going to increase gates and develop the bag doop, atm, sky train and car hire.
The present day, the airport have a two part of areas with departures and arrivals. In departure area, check-in facility is available at north western side and the cafe area is locate north east as well as the arrival area can not have any facility.In north side, 1 to 8 gates are locate with Walkway service and middle of the airport have a security passport control and customs department.
In the next your, the cafe area is going to Souther west side and the check-in area will be move away to the cafe area. The bag drop facility will be replace with check-in area in departure gate. The arrival gate would be develop with car hire in southeast and above that build atm at north side.The shops will be conduct near gate no. 1 and the gates are going to rose with 18.Between the all gates the sky train is going to develop.
