The image displays a timeline chart detailing the construction phases of a house across 16 weeks: Assess site occupies week 1; Draw up plans spans weeks 2-3; Obtain approval covers weeks 4-5; Hire builders extends from weeks 4 to 6; Purchase insurance takes place week 5-6; Prepare site runs across weeks 6-7; Pour concrete foundation occurs weeks 7-8; Construct frame is scheduled for weeks 8-11; Install walls & roof spans weeks 11-14; Fit windows takes place during weeks 12-13; Install plumbing & electricity covers weeks 13-14; Paint exterior & interior is allocated for weeks 15-16. Preparation phase lasts weeks 1 to 8 and Building phase from weeks 9 to 16.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The diagram illustrates the process of building a new house.
According to the diagram, there are all stages and time to complete two process from preparation to construction. Look at it in detail, there are 12 phase and it took 16 week to finish the stages.
It can be seen the preparation has 6 stages. Among them, the stages draw up plans take 3 week which was longest of all the gradation. While the obtain opproval came in second and other stages each take a week.
The remaining 6 phase of building process have similarities in contruction time. In which, each stage take from 1 to 2 week to complete, for example, construct frame, fit window and paint exterior and interior takes a week each. Meanwhile, the remaining stage as pour concrete foundation, install wall and roof, install plumping and electricity take 2 week each.
Word Count: 145