The given maps illustrate the layout of a school site in 2004, and various transformations in it by the year 2024.
Overall, it can be readily apparent the area of school site has experienced a sea change with main emphasis on expend the academic and infrastructure of the school. Moreover, several radical changes have been made over the period of 20 years.
Regarding the layout of school site in 2004, there was road, which started from on the south west side to ended with on the north side, and it was in Z-shape road track. The car park located on the north west side along with the main entrance suitated. Furthermore, there was a path, which connected main entrance and sport field, which was on north side near main road. The school building 1 and 2, were opposite each other, and the path was between them. The maximum area of the south covered with forest. Also, other forest area was on east side of the school area.
Moving to the changes in 2024, the road shape and location of the ended has changed, it has ended on east side. Probing further, the part has connected with school building 1 and 2, and school building 3 because the sport field areas has converted into school building 3. In the east side forest area has developed, the car park has newly constructed, and on the south east, the sport field has transferred. The main entrance and car area park on the north west coner have not renovated and rechanged. Similarly, the forest on the south area has remained on same place.
