The map show the building of a college at the present and transformation of the college to 2020 . Overall , the college premises will become more built up as studeent capacity increased noticeably . A range of modern facilities will introduced to support both academic and heatlh .
The college offer fewer facilities at the moment . Acces to the college from the north , where garden and footpath located , with lunch area situates at the opposite of the garden . Further from lounch area , there are 2 clasroom in the east overlooking to the WC and library in front , while reseption desk and clasroom block are locates above these facilities . Thera are also road in the south occuyping small part of the layout .
In the 2020 , the college will undergo mojor changes in its layout . While car park will remaine intact , the garden and will redesign into shop .Four of them will be located on the right wing of the hall, replacing the reception and the library. The toilet, which is currently in the south part of the college, will further be repositioned in the north area. Moreover, there will be a new shop beside the lunch area.
