Our system will evaluate the answer based on this AI-generated description.
The image shows two plans depicting the layout of Southwest Airport currently and post-development. The current layout includes a security checkpoint, passport control and customs, check-in, gateways, a lift and stairs, and a restaurant, labeled 1 to 6 respectively. The arrivals and departures are located below these facilities. The post-development layout shows an expanded setup with 18 labeled facilities including separate domestic and international check-ins, additional restaurants, shops, a business center, a bank, and a car hire. The security and passport control areas are also relocated, and the departure and arrival areas are above the facilities.
Given the complexity of the image, the above description may not be entirely accurate.
Skyrocket your IELTS band score by 1-2 points in under a month with our premium plan!
Note: Both the topic and the answer were created by one of our users.
The maps below present the changes that have taken place at the Southwest Airport since its reconstruction in the unnamed year. One noticeable feature is that the whole size of the airport was extended a lot. The number of provided facilities was dramatically increased and developed.
It can be clearly seen that at the bottom of the plan besides initial conveniences the new were added, for example, check-in, bank drop and cafe to the departures, and ATM, restaurant and car hire to the arrivals. On the top of the map the shape of corridors was modernise, due to the rise of departures and arrivals gates from 8 to 18. Moreover, along the passages walkway area was replaced with sky train.
It is worth noticing that security, passport control and customs remained in their places in the same conditions. Nevertheless, in the left corner of the empty zone the shop line was constructed.
Word Count: 152