The provided plans illustrate the transformation of Poth Harbour from the year 200 to the present day.
Overall, the harbour has undergone notable enhancements, including the expansion of docking facilities and the introduction of new amenities, while certain features have remained unchanged.
In the 2000, Poth harbour was charactirized by a single northern dack capable of accomadating two vessels,complemented by a public beach situated to the east and a marina designated for private yachts to the west.The Marina (private shops) which was located in the top left right hand corner was eliminated to build a fishing boats. The structure included essential facilities such as a car park, bathroom and a lifeboat station, which were interconnected by a network of roads.In the other hand,the showers & toilets which was located in the middle left hand corner was destroyed. Fishing boats and Marina private boats changes place.Furthermore, new cafes and shops have been established to enhance visitor experience, while existing amenities such as the public beach, car park, showers, toilets, marina, and lifeboat station have remained consistent in their positioning
