The diagrams display the changes that have taken place at a school from 1985 to the present. In general, the school has undergone notable transformations, particularly in the expansion of educational and recreational facilities, which support the increasing number of students, rising from 1500 to 2300.
In 1985, the northern part of the campus featured a rectangular car park surrounded by a road that connected the entrance and exit. This car park has now been redesigned into a semicircular shape, along with the road, while a smaller car park in the southwest has been removed. The driveway leading south to large playing fields has also been demolished to make space for trees.
On the southern side, the playing fields, which occupied much of the area in 1985, have been halved to allow the construction of a new sports complex, including a swimming pool and a fitness centre. Furthermore, the library on the west side of the campus has been upgraded into a learning resource centre with a new computer room. A larger classroom building has been built to the south of the centre, replacing the classrooms that once stood on the east side of the library. The two-storey classroom block has been expanded with an additional level, and a new classroom building has been added to the south.
