The diagram depicts the school location in 2004 and the plan for site modifications in 2024.
The school will have an additional buildings expanding through out the sports field resulting to a narrow sports field but with an addtional parking space for cars.
In 2004 the site of the school shows that there are only two school buildings with a large sports field, surrounded by trees. The buildings are divided by a pathway leading to the sports field. Hence, the site modification for the school’s location, building 1 and 2 will be interconnected, resulting to a shorter pathway that leads to an additional building –building 3– in 2024.
The similarities of school location is that the school buildings 1 and 2 are still located in the same area, where as the school building 1 is built near the main entrance and school building 2 is adjacently located towards it. The sports field is still placed at the far end of the buildings and the car parks are still placed at the same area.
In conclusion, the modification of the school’s location has major changes due to the addition of the third building and a second car park.
