The provided diagrams illustrate the transformation of the theatre layouts from 2010 to 2012.
Overall, the theatre saw a significant change, both in the main area of the show and establishment of perfomers’ and audiences’ facilities.
In 2010, the most northen part of the theatre is a dressing room, with a door in the top west of it connecting to a storage. The stage is located just south of the dressing room which could be accessed from the hallway in the east of it. Right to the south of the stage, auditorium was sited which consisted of many rows of seat for audience, a door in the top west of it, and connected to the lobby via two doors in each north corner of the room. The lobby was composed by an admin office in the west and a ticket office right in the southeast corner and a café was located in opposite part, with a main door was positioned between these two.
Two years later in 2012, the dressing room was moved into the top west and connected to a shower in the south of it. It was connected to a stage through a corridor, running in the northen and eastern part of buliding, and a storage was located in the top east of building. Additionally, the stage was expanded with a two-fold extention and the auditarium, however, remained unchaged during this period. The lobby was expanded as well and a restaurant, new establishment, took the vastest place of it in the sotheast area. As a result, the admin office was reconstructed in the northwest part of restaurant, while ticket office was relocated to the southeast corner of the layout.
