The maps illustrate how a small theatre was changed from 2010 to 2012. Overall, the theatre had undergone drastic changes, with the most notable being the expansion of the front and back areas to accommodate new facilities. However, the seating area had remained intact throughout the year.
In 2010, upon entering the main door, visitors could spot the ticket and admin offices adjacent to each other in the left corner and a cafe on the opposite side. However after 2years, the ticket office had been moved to replace the cafe, while the admin office had been relocated to the left side of the seating area with a different entrance. The relocation of these rooms and the expansion of the front area had facilitated ( tao dieu kien) the construction of a restaurant in the left corner in 2012.
Turning to the rear end of the theatre, in 2010 there was a long corridor in the right side leading to the dressroom and the storage used to be in the west. However, in 2012 the dressroom had been converted to the previous storage area, having a new appearance of showers at the bottom. The storage had been moved to the East side of the rear theatre and widened its sides. Regarding the corridor, it had enlarged and occupied the previous dressing room area to become the L shape. Finally, the stage and seating area remain intact throughout the years.
