The plans describe the renovation of the small theatre building between 2010 and 2012.
Overall, it is noticeable that the renovation took place in more spaces to add additional rooms such as restaurants, showers, and close Café’ and then, the space for the Auditorium remained unchanged in 2010.
In 2010, Café’ was beside the main entrance, admin office was next to the ticket office. Storage was located at the left of the map. It could be seen that Media and Storage shared the same space at the top layer of the map.
However, there were noticeable changes related to renovation on the map in 2012. This time, the ticket office was beside the main entrance where the café used to be, which was completely closed. The admin office was moved to the top of the first layer to give more space for Restaurants. New showers were built up alongside the auditorium at the second layer. The most significant changes were the top layer where the Media was shifted to the old location of the Storage room. Then, the new storage room was seen on the right spot of the top layer of the map. Space for storage was extended whereas a new hall was built up beside the stage.
