🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: WRITING TASK 1 You should spend about 20 minutes on this task. The following maps show the changes that have taken place in the centre of a town since 1700. Summarize the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

Image for topic: WRITING TASK 1 You should spend about 20 minutes on this task. The following maps show the changes that have taken place in the centre of a town since 1700. Summarize the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.
Our system will evaluate the answer based on this AI-generated description.
The image depicts two maps of a town center, one from 1700 and one from today. In 1700: a bridge leads to Steggle Farm, with a hotel, market square, church, shops, fields, Goode Farm, and stables situated along High Street and St Peter’s Lane; houses are near the road intersections. Today: the bridge leads to a public park and Steggle Road; a car park replaces Goode Farm, a block of flats near the church replaces the stables; a roundabout is added; a supermarket replaces fields; additional houses are along the main streets; the hotel, market square, and church remain unchanged along High Street and St Peter’s Lane.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The diagrams present the changes of the town centre from past to present.

Overall, the location experienced dramatic transformation and modernization of infrastructure. Half of the greenery zone were reduced and new buildings were built.

First and foremost, both Steggle Farm and Goode Farm were demolished. Car park and twelve new houses were built in the original location of Steggle Farm, which is located in the north of the town centre. Large areas of grassland situated in the west of the town were reduced and used to build the new Steggle Road. The grassland in the south and the north east side of the town were redeveloped, 12 more housing estates and 2 more shops were built compare to 1700 in the area to the south of the market square. While the two houses and the stabbles were all knocked off and transformed into houses and block of flats.

Apart from that, the hotel, market square and church remain at the same place , which is in the middle of the centre over the years, though a new grassland is built at this location.

Word Count: 184

Answers On The Same Topic:

WRITING TASK 1 You should spend about 20 minutes on this task. The following maps show the changes that have taken place in the centre of a town since 1700. Summarize the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The two plans show the centre of a city in different times, the first plan was taken in 5he year 1700, while the second one was taken recently. In 1700 the city centre included three big buildings in the middle, market square location was in the centre and beside it on the right there is […]

WRITING TASK 1 You should spend about 20 minutes on this task. The following maps show the changes that have taken place in the centre of a town since 1700. Summarize the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The illustration below demonstrate the variation that have taken place in the center of a town since 1700 Overall,exept for the hotel ,market square , church and the bridge the place had a lot of changes. Firstly,the goode farm it been replaced by a car park and so much houses .Than st peteer’s lane street […]

WRITING TASK 1 You should spend about 20 minutes on this task. The following maps show the changes that have taken place in the centre of a town since 1700. Summarize the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The map below illustrates how the city centre has been transformed from 1700 untill the present. Overall, it is apparent that a comparison of maps shows that the area has transformed into more urbanized and modern place. The most noticeable change is redeveloped road infrastructure. Despite significant reforms in the city centre, some areas have […]

WRITING TASK 1 You should spend about 20 minutes on this task. The following maps show the changes that have taken place in the centre of a town since 1700. Summarize the information by selecting and reporting the main features, and make comparisons where relevant. Write at least 150 words.

The map shows how a town center has developed since 1700 till nowadays. There have been several changes, the most noticeable of them are changes in accommodation and reconstruction of residential area, modernization and expanding of trading areas, and new roads building. In 1700, in the central area of the town center were founded several […]

See All

Other Topics:

The two maps show Tilden Airport and the surrounding area in 1985 and 2015. Write a report for a university lecturer summar ising tl1e information shown in the maps.

The two maps depict the changes Tilden Airport and the surroundings underwent from 1985 to 2015. Overall, the airport and the related infrastructure were expanded at the expense of Johnson’s farm, with a new runway added. Factories were demolished, allowing for airport development and touristic facilities, as well as an upgrade in the transport system. […]

The map presented delineates the changes occurred in a small town located in the western region of Ireland from 2000 to present day. Overall, the map meticulously illustrates how the various areas of the village are used in the past and present. Primarily, the town is transformed into more developed residential locality with the establishment of new buildings. Moreover, the market facing sea-side is extented with numerous food chains and farmland is modified into a diverse park.

In general, the two images side by side depict by illustrating the difference in landscaping in 2000 compared to present day in a quaint village to the west of Ireland. Overall, the village has undergone significant development in housing, alongside new constructions and changes to the farmland. The farmland in the north-west area seems to […]

The maps below show the village of Stokeford in 1995 and now.

The two maps demonstrate changes and developments which have taken place in a village between 1995 and present time. Overall, it is clear that urbanization and infrastructure development appeared . Farmland and forest park were replaced by golf and tennis facilities. The fishing installation was demolished, instead it was converted into apartments. Major developments occurred […]

The diagram shows Rampart street today and the plan for changes to the street in 2035

The map gives information about Rampart street in the present day and in the future 2035. Overall,the main road will be reconstucted into a sidewalk and cycle line. Moreover, additional buildings will be built. Turning the present day, the diagram illustartes bustling roads with some buildings. If start with the north-east side, there is a […]

The leo maps below illustrate one area with a difference of a hundred years

The data demonstrate modifications that have taken place in the Sawry district neighbourhood since 1920 to 2020 Overall, In Oak Avenue on top new bridge was bulid while beach was demolished furthermore the trees were saved. In contrast Miller’s Lake didn’t change however beside of Miller’s lake half trees were destroyed Since 1920, on the […]

The maps below show the plan of a small school in 1980 and 2010. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The given maps demonstrate the strategy of a small school between 1980 and 2010. Overall, the school accommodated more facilities for students in 2010. Additionally, it is evident that the building complex in the northwest was widened, while the trees were supplanted by learning facilities and a car park for pupils. Regarding the illustrations, the […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.