🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 7+: The maps below present the changes that have taken place at the Southwest Airport since its reconstruction in the unnamed year.

Image for topic: The maps below present the changes that have taken place at the Southwest Airport since its reconstruction in the unnamed year.
Our system will evaluate the answer based on this AI-generated description.
The image shows two plans depicting the layout of Southwest Airport currently and post-development. The current layout includes a security checkpoint, passport control and customs, check-in, gateways, a lift and stairs, and a restaurant, labeled 1 to 6 respectively. The arrivals and departures are located below these facilities. The post-development layout shows an expanded setup with 18 labeled facilities including separate domestic and international check-ins, additional restaurants, shops, a business center, a bank, and a car hire. The security and passport control areas are also relocated, and the departure and arrival areas are above the facilities.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The pictures illustrate the current layout of Southwest Airport, and its planned alterations in the next year. Overall, the airport will undergo signifcant changes, with an increase in the number of gates and the addition of customer-facing facilities.

Regarding a departure and arrival areas, the location will remain the same. A check-in in the departure area is expected to be relocated from the left side to the right side to create space for a bag drop area. Moreover, a café that is currently located opposite to the check-in area will be repositioned closer to the departure hall doors. Turning to the arrival area, which was absolutely empty, will house a new cafe, an ATM machine, and a car hire zone.

Concerning the remaining areas, security, passport control, and customs will be unchanged. New shops will be constructed passing through security, whereas the area after the customs and passport control will stay empty. The most conderable changes will involve replacing two walkways with a sky train and increasing the number of gates from 8 to 18 leading to it.

Word Count: 178

Answers On The Same Topic:

The maps below present the changes that have taken place at the Southwest Airport since its reconstruction in the unnamed year.

The plans illustrate the current layout of Southwest Airport and the changes that will be made after its redevelopment next year. Overall, the airport is expected to undergo significant expansion and modernization. The number of gates will more than double, while several new facilities, including shops, a bag-drop area, an ATM, a sky train and […]

The maps below present the changes that have taken place at the Southwest Airport since its reconstruction in the unnamed year.

The given plans below illustrates the area of an airport now and compared to how it will look after reform another year. Overall gates of an airport is held to be extended more in future. Similarly some more facilities and the new area for will be introduced after the development such as ATM, Cafe. To […]

The maps below present the changes that have taken place at the Southwest Airport since its reconstruction in the unnamed year.

The provided map illlustrates the current condition of southwest airport and how it’s will look after re-novation. In oveall perspectives, there are many significant change had been planned including replacing area, adding constomer services and repurpose of place. At present upon passing through the departure in right side check-in and opposite side cafe however, after […]

The maps below present the changes that have taken place at the Southwest Airport since its reconstruction in the unnamed year.

The plans illustrates the layout as present condition and after redevelopment of southwest airport. Overall,it can clearly seen that the airport will expanded many facilities and number of gates in future . At present, passing through the departures area there is cafe and check_in while after redevelopment of airport there will be bag drop along […]

The maps below present the changes that have taken place at the Southwest Airport since its reconstruction in the unnamed year.

The two maps compare the current layout of Southwest Airport with the planned renovations. Overall, the main differences will include an expansion in the number of gates, the replacement of walkways, and the addition of several new features aimed at enhancing convenience in both the departure and arrival areas. Focusing on the major changes, we […]

See All

Other Topics:

The diagram below shows the changes of the town named Shakefield

The maps compare the town of Shakefield in 1995 and at the present time. Overall, Shakefield has become more developed, with a greater focus on tourism and accommodation. Several new facilities have been introduced, while some traditional features have disappeared. In 1995, the coastline was used mainly for fishing activities, with a fish market and […]

The maps below show the plan of a small school in 1980 and 2010. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The given maps compare the differences in the layout of a small school in 1980 and in 2010. Overall, it is clearly evident that the construction of the school was expanded to meet the need of growing number of students. Additionally, it is also easily seen that the school’s vegetation was eliminated and replaced by […]

Write full task 1 report based on a map. The maps below show a bookstore in 2000 and now.

The maps compare a bookstore in 2000 and at the present time. Overall, the bookstore underwent a significant change in the location of book categories. The fiction books in particular rooms were replaced by art, hobbies, cookery and non-fiction books, as their former locations were used for cafe and tables. In 2000, there were travel, […]

The diagram below show the site of a school in 2004 and the plan for the changes to the school site in 2024

The maps illustrate what changes took place at a school site between 2004 and 2024. Overall, the area was expanded to accommodate more students, with the addition of a new school building at the expense of part of the sports field. In addition, the woodland was reduced in size to make way for a new […]

The maps below show a bookstore in 2000 and now. Summarize the information and reporting the main features and make comparisons where relevant.

The illustrations depict the significant changes of a certain bookstore in 2000 and now. Overall, there are a lot of differences in this store after 26 years.The most noticeable changes are the development of service,the relocating of fiction,cookery and art, and the disapearence of hobbies. In the northern side, the table is emerged in hobbies,cookey […]

Task 1: The plans show a student common room from five years ago and now. Summarize the information by selecting and reporting the main features and make comparisons where relevant.

The diagrams depict how a student regular room has changed over the past five years. Overall, the room has become more modern and multifunctional, with the addition of recreational amenities and extra appliances as well as the reorganization of seating arrangements to accommodate a wider range of activities. Five years ago, the room has a […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.