🔥 Today Only: Save 30% on Premium — Offer Ends Soon! - Upgrade Now!
Map

Band 6+: The diagrams below show the present building of a college and the plan for changes to the college site in the future.

Image for topic: The diagrams below show the present building of a college and the plan for changes to the college site in the future.
Our system will evaluate the answer based on this AI-generated description.
The image contains two maps, one labeled "Present College" and the other "Plan in 2020". Both maps have a road at the bottom with a bus stop to the right, a car park on the left with 6 red car symbols indicating parking spaces, and a labeled garden at the top. A dotted line indicating footpath traverses from the bus stop through the center of the maps upwards. In the Present College, from left to right, there are two Classroom blocks, a Lunch Area, Reception, Toilet, and Library. In the Plan in 2020, from left to right, there are two Classroom blocks, Shop, Lunch Area, Classroom, Reception, Toilet, Library, and an additional Classroom block.
Given the complexity of the image, the above description may not be entirely accurate.
Note: Both the topic and the answer were created by one of our users.

The maps illustrate a university as it is now and after reconstruction in 2020. Overall, the college will experience radical changes with the most noticeable being the expansion of campus and car park. In addition, some new facilities will be built in the campus area, which provide entertainment and study opportunities for students.

The campus area has seen significant changes, with the repositioning of facilities and the construction of more buildings. At present, there are only three classrooms inside the area. The plans suggest that the campus area will expand with more classrooms. Moreover, the reception will be moved to the center of the area, which is towards the new entrance at the south, and the library reconstructed on the west-south side. The toilets will be changed to the opposite end of the property, where the old entrance was. Another feature is that new shop will be built in lunch area, and lunch area will be restricted.

With the surrounding land, the garden and footpath will be removed. Besides, the car park will be expanded for personal transportation. In the south of campus area, the bus stop located near main road will not be changed in the future.

Word Count: 198

Answers On The Same Topic:

The diagrams below show the present building of a college and the plan for changes to the college site in the future.

The two maps illustrate the current layout of a college building and the proposed changes for its future development. Overall, the site is expected to undergo a complete internal rearrangement, with several buildings being removed and relocated to different parts of the area. Regarding the external changes, the footpath between the main building and the […]

The diagrams below show the present building of a college and the plan for changes to the college site in the future.

The map illustrates students college between present and in 2025. Overall, the college significant change with modern infostructure and add more facilities compared then in the future. At present, in the middle of the plan lunch area and there were three classroom one reception for people also there was a library lucated South east of […]

The diagrams below show the present building of a college and the plan for changes to the college site in the future.

The diagrams illustrate the layout of a college at present and the proposed changes that are planned for 2025. Overall, the college is expected to undergo significant redevelopment, with the addition of new facilities, a rearrangement of classrooms, and the removal of some existing features such as the garden and footpath. It is also clear […]

The diagrams below show the present building of a college and the plan for changes to the college site in the future.

The two maps illustrate the present layout of a college building and the proposed changes that are expected to take place in the future. Overall, the college is expected to undergo a significant expansion, retaining most of its existing facilities while becoming more diversified. This transformation will involve the introduction of a shop, additional classrooms […]

The diagrams below show the present building of a college and the plan for changes to the college site in the future.

The two given diagrams depict a present college building and its renovation plan in 2020. Looking from an overall perspective, it is readily apparent that the layout will undergo significant changes to serve students’ demand, while the road and the bus station at the south remain unchanged. The footpath and the garden will be vanished […]

See All

Other Topics:

The maps below show the development of a town called Dorchester in Britain between 1996 and 2016

The maps illustrate the changes that took in a town named Dorchester in Britain between 1996-2016. Overall, the town witnessed a dramatic transformation during this period, becoming more visibly modernized with the renovation of some facilities, while some key features remained relatively unchanged. In 1996, the town called Dorchester was a simpler area, with key […]

The maps show the before and after redeveloping a campsite. Describe main features and changes

The maps above show an ancient situation of a campsite, and its view after development constructions. Overall, the site maintain its function and stayed providing the same services as before with new plan and more options. The old zone included a small lake at the centre sorounded by trees. On the East side of this […]

the map illustrate show the changes that have taken place in zoo

The map illustrates the changes that have taken place in an Australian zoo from 1960 to present day. Overall, it can be clearly seen that the zoo has undergone significant modernization and expansion. Several new facilities have been added, including entrances, ferry, cable cars and wild animals, while some facilities were removed or relocated. In […]

The maps below show the changes that have taken place at Queen Mary Hospital since its construction in 1960. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The maps below illustrate the changes that have occurred at Queen Mary Hospital since its foundation in 1960. Overall, the site was transformed from a mixed-use area into a predominantly medical facility. Over time, the number of healthcare buildings increased significantly, adding the cancer centre and the pharmacy to the extensions. To begin, in 1960, […]

The maps below show the layout of a bookshop before and after it was redeveloped.

The given maps illustrate the layout of a book shop in past and after it was reconstructed in present Overall, it is clear from the maps, that the bookshop has gone through significants changes in the present compare to past ; there has been added new table and a cafe at present. Although, the entrance […]

The maps below show a bookstore in 2000 and now. Summarise the information by selecting and reporting the main features, and make comparisons where relevant.

The given maps illustrate a bookstore in 2000 and now. In 2000, the bookstore theme was simple but now, its theme on modern taste. Overall, the given maps show the changes which were made to look bookstore more convinient. The biggest change made in a bookstore is dividing the section into particular sections for each […]

See All
We have detected unusual activity on your device.
Please verify your identity to continue.
Note: This verification step won't sign you in. If you have a premium account, please log in to access the service as usual.
Google/Gmail Verification
Or verify using Email/Code
We've sent a verification code to:
youremail@gmail.com (Not your email?)
Enter it below to complete the verification process.
Ensure your email address is correct, your inbox is not full, and you check your spam folder. If no email arrives, consider using an alternative email.
You will need a Premium plan to perform your action!
Note: If you already have a premium account, please log in to access our services as usual.

Plans & Pricing

Our mission is to make quality education accessible for everyone.
However, to keep our hardworking team running and this service alive, we genuinely need your support!
By opting for a premium plan, not only do you sustain us in achieving the mission, but you also unlock advanced features to enrich your learning experience.

Free

For learners who aren't pressed for time

What's included on Free
100+ Cambridge IELTS Tests
Instant IELTS Writing Task 1 & 2 Evaluation (2 times/month)
Instant IELTS Speaking Part 1, 2, & 3 Evaluation (5 times/month)
Instant IELTS Writing Task 1 & 2 Essay Generator (2 times/month)
500+ Dictation & Shadowing Exercises
100+ Pronunciation Exercises
Flashcards
Other Advanced Tools

Premium

For those serious about advancing their English proficiency, and for IELTS candidates aspiring to boost their band score by 1-2 points (especially in writing & speaking) in just 30 days or less

What's included on Premium
Save Your IELTS Test Progress
Unlock All Courses & IELTS Tests
Unlimited AI Conversations
Unlimited AI Writing Enhancement Exercises
Unlimited IELTS Writing Task 1 & 2 Evaluation
Unlimited IELTS Speaking Part 1, 2, & 3 Evaluation
Checked Answers Will Not Be Published
Unlimited IELTS Writing Task 1 & 2 Essay Generator
Unlimited IELTS Speaking Part 1, 2, & 3 Sample Generator
Unlimited Usage Of Advanced Tools
Priority Support within 24h (12-month plan only)

Due to the nature of our service and the provided free trials, payments are non-refundable.
Nếu bạn là người Việt Nam và không có hoặc không muốn trả bằng credit/debit cards, bạn có thể thanh toán bằng phương thức chuyển khoản:



Chọn gói:
419,000₫ 277,000 ₫ cho gói 1 tháng (chỉ 9,233₫/ngày)
1,239,000₫ 597,000 ₫ cho gói 3 tháng (chỉ 6,633₫/ngày)
2,469,000₫ 1,027,000 ₫ cho gói 6 tháng (chỉ 5,706₫/ngày)
4,929,000₫ 1,417,000 ₫ cho gói 12 tháng (chỉ 3,936₫/ngày)


Sau khi chuyển khoản, vui lòng đợi trình duyệt tự động điều hướng bạn trở lại Engnovate và bạn sẽ ngay lập tức nhận được mã kích hoạt tài khoản premium.
Nếu có lỗi xảy ra, bạn có thể liên hệ với team thông qua một trong các phương thức: email đến helloengnovate@gmail.com hoặc nhắn tin qua facebook.com/engnovate.
Vì toàn bộ công cụ trên website đều có thể sử dụng thử miễn phí, Engnovate không hỗ trợ hoàn tiền.